<?xml version='1.0' encoding='UTF-8'?>
<feed xmlns="http://www.w3.org/2005/Atom" xml:lang="en">
  <id>https://hpc.vub.be/</id>
  <title>VUB-HPC Posts</title>
  <updated>2026-11-12T02:01:25.020321+00:00</updated>
  <link href="https://hpc.vub.be/"/>
  <link href="https://hpc.vub.be/posts/atom.xml" rel="self"/>
  <generator uri="https://ablog.readthedocs.io/" version="0.11.11">ABlog</generator>
  <entry>
    <id>https://hpc.vub.be/news/2026/nov-system-upgrade/</id>
    <title>System update roll-out to VUB-HPC clusters</title>
    <updated>2026-11-04T00:00:00+00:00</updated>
    <author>
      <name>HPC Team</name>
    </author>
    <content type="html">&lt;section id="system-update-roll-out-to-vub-hpc-clusters"&gt;

&lt;p&gt;We are updating the operating system on VUB Tier-2 clusters Hydra and Anansi
and VSC Tier-1 &lt;strong&gt;sofia&lt;/strong&gt; with the latest security and bug fixes.
&lt;strong&gt;Access to these clusters will be unavailable for 15-30 min on Thursday 5th
November at 02:00 CET.&lt;/strong&gt; We will reboot the login nodes and the OnDemand
service of &lt;em&gt;portal.hpc.vub.be&lt;/em&gt; and &lt;em&gt;portal.sofia.vub.be&lt;/em&gt;, disconnecting any
active user sessions on those systems.&lt;/p&gt;
&lt;p&gt;The roll-out of updates to the computes nodes will start on &lt;strong&gt;Thursday Nov
5th&lt;/strong&gt; and will be progressively carried out in the coming days.
This operation has a minimal impact on our users: compute capacity will be
slightly lower during the update, but there will be no downtime of the
clusters and all job queues will remain operational.&lt;/p&gt;
&lt;p&gt;These operations are part of the regular updates to keep VUB-HPC infrastructure
secure. Please contact us at &lt;a class="falink reference external" href="mailto:hpc&amp;#37;&amp;#52;&amp;#48;vub&amp;#46;be"&gt;&lt;span class="fa-solid fa-envelope"&gt;&lt;/span&gt;VUB-HPC Support&lt;/a&gt; if you have any comments or questions
about these changes.&lt;/p&gt;
&lt;/section&gt;
</content>
    <link href="https://hpc.vub.be/news/2026/nov-system-upgrade/"/>
    <summary>We are updating the operating system on VUB Tier-2 clusters Hydra and Anansi
and VSC Tier-1 sofia with the latest security and bug fixes.
Access to these clusters will be unavailable for 15-30 min on Thursday 5th
November at 02:00 CET. We will reboot the login nodes and the OnDemand
service of portal.hpc.vub.be and portal.sofia.vub.be, disconnecting any
active user sessions on those systems.</summary>
    <category term="anansi" label="anansi"/>
    <category term="hydra" label="hydra"/>
    <category term="maintenance" label="maintenance"/>
    <category term="motd" label="motd"/>
    <category term="sofia" label="sofia"/>
    <published>2026-11-04T00:00:00+00:00</published>
  </entry>
  <entry>
    <id>https://hpc.vub.be/news/2026/october-hydra-sofia-security-shutdown/</id>
    <title>Emergency lockdown of VUB-HPC clusters</title>
    <updated>2026-10-21T00:00:00+00:00</updated>
    <author>
      <name>HPC Team</name>
    </author>
    <content type="html">&lt;section id="emergency-lockdown-of-vub-hpc-clusters"&gt;

&lt;div class="note update admonition"&gt;
&lt;p class="admonition-title"&gt;Updated on 21/10/2026&lt;/p&gt;
&lt;p&gt;17:00 CEST: Access to HPC clusters of VUB (Hydra, Anansi) and VSC Tier-1
sofia is fully restored.&lt;/p&gt;
&lt;/div&gt;
&lt;div class="note update admonition"&gt;
&lt;p class="admonition-title"&gt;Updated on 20/10/2026&lt;/p&gt;
&lt;p&gt;17:00 CEST: We are in the process of deploying the required system updates
to fix the security issues that caused this emergency lockdown.&lt;/p&gt;
&lt;p&gt;Hydra and Anansi are expected to be partially online on Wednesday October
21st at 10:00 CEST. Login nodes and the OnDemand portal will be accessible
to all users. Compute nodes on Hydra will be fully online by the end of the
day at 17:00 CEST.&lt;/p&gt;
&lt;p&gt;Sofia is expected to be fully online by Wednesday October 21st at 12:00 CEST&lt;/p&gt;
&lt;/div&gt;
&lt;p&gt;&lt;strong&gt;Access to the HPC clusters of VUB (Hydra, Anansi) and the VSC Tier-1 cluster
sofia is closed until further notice.&lt;/strong&gt;&lt;/p&gt;
&lt;p&gt;This measure includes the following services:&lt;/p&gt;
&lt;ul class="simple"&gt;
&lt;li&gt;&lt;p&gt;SSH connections through the terminal interface&lt;/p&gt;&lt;/li&gt;
&lt;li&gt;&lt;p&gt;OnDemand sessions through &lt;em&gt;portal.hpc.vub.be&lt;/em&gt; and &lt;em&gt;portal.sofia.vub.be&lt;/em&gt;&lt;/p&gt;&lt;/li&gt;
&lt;li&gt;&lt;p&gt;Remote sessions with tunneling such as VS Code applications&lt;/p&gt;&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;All active sessions in our clusters have been terminated as well. Compute nodes
and the job scheduler will continue to process jobs in the queue. The only jobs
canceled are those that involve remote sessions through OnDemand portals.&lt;/p&gt;
&lt;p&gt;Users that urgently need to access their data, can do so through the
&lt;a class="reference external" href="https://app.globus.org"&gt;Globus&lt;/a&gt; platform. Please check our documentation on
&lt;a class="vsclink reference external" href="https://docs.vscentrum.be/globus/index.html"&gt;&lt;span class="sd-badge"&gt;&lt;span&gt;VSCdoc&lt;/span&gt;&lt;/span&gt;Globus&lt;/a&gt; if you are not familiar with it.&lt;/p&gt;
&lt;p&gt;We cannot yet provide a timeline for the complete resolution of this issue as
we still need to complete our investigation on it. We will keep this post up to
date with any progress on this issue.&lt;/p&gt;
&lt;p&gt;For any comments or questions, please contact us at &lt;a class="falink reference external" href="mailto:hpc&amp;#37;&amp;#52;&amp;#48;vub&amp;#46;be"&gt;&lt;span class="fa-solid fa-envelope"&gt;&lt;/span&gt;VUB-HPC Support&lt;/a&gt;.&lt;/p&gt;
&lt;/section&gt;
</content>
    <link href="https://hpc.vub.be/news/2026/october-hydra-sofia-security-shutdown/"/>
    <summary>17:00 CEST: Access to HPC clusters of VUB (Hydra, Anansi) and VSC Tier-1
sofia is fully restored.</summary>
    <category term="VSC" label="VSC"/>
    <category term="hydra" label="hydra"/>
    <category term="security" label="security"/>
    <category term="sofia" label="sofia"/>
    <published>2026-10-19T00:00:00+00:00</published>
  </entry>
  <entry>
    <id>https://hpc.vub.be/news/2026/linux-hpc-training/</id>
    <title>Linux/HPC Intro Training Sessions (28/30 October 2026)</title>
    <updated>2026-10-09T00:00:00+00:00</updated>
    <author>
      <name>HPC Team</name>
    </author>
    <content type="html">&lt;section id="linux-hpc-intro-training-sessions-28-30-october-2026"&gt;

&lt;p&gt;We are pleased to announce our annual on-site introductory training sessions,
held at the Brussels Humanities, Sciences &amp;amp; Engineering Campus (Elsene).&lt;/p&gt;
&lt;ul class="simple"&gt;
&lt;li&gt;&lt;p&gt;&lt;strong&gt;Wednesday 28 October: Introduction to Linux&lt;/strong&gt;&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;&lt;p&gt;&lt;a class="falink reference external" href="https://vrijeunive.plateau.com/learning/user/deeplink.do?linkId=ITEM_DETAILS&amp;amp;componentID=R%26D_Linux&amp;amp;targetStudentSysGUID=&amp;amp;componentTypeID=COURSE&amp;amp;fromSF=Y&amp;amp;revisionDate=1695649020000&amp;amp;actingAs=#/B55663D0A5A1D0AB18005C42C7A9FF15"&gt;&lt;span class="fa-solid fa-up-right-from-square"&gt;&lt;/span&gt;Register as ATP/PostDoc/PhD/ZAP&lt;/a&gt;&lt;/p&gt;&lt;/li&gt;
&lt;li&gt;&lt;p&gt;&lt;a class="falink reference external" href="https://forms.office.com/Pages/ResponsePage.aspx?id=qHxbaagtRUWi2kLQN4TlhSUE0WUIZ09JiP9GMZUlAWpUODFaRlM0TDI5Vk9FQUswWFJHV1IzTVlPSC4u"&gt;&lt;span class="fa-solid fa-up-right-from-square"&gt;&lt;/span&gt;Register as a VUB master/bachelor student&lt;/a&gt;&lt;/p&gt;&lt;/li&gt;
&lt;/ul&gt;
&lt;/li&gt;
&lt;li&gt;&lt;p&gt;&lt;strong&gt;Friday 30 October: Introduction to HPC&lt;/strong&gt;&lt;/p&gt;
&lt;ul&gt;
&lt;li&gt;&lt;p&gt;&lt;a class="falink reference external" href="https://vrijeunive.plateau.com/learning/user/deeplink.do?linkId=ITEM_DETAILS&amp;amp;componentID=R%26D_HPC&amp;amp;targetStudentSysGUID=&amp;amp;componentTypeID=COURSE&amp;amp;fromSF=Y&amp;amp;revisionDate=1695647760000&amp;amp;actingAs=#/739962D0A5A1D0AB18005C42C7A9FF15"&gt;&lt;span class="fa-solid fa-up-right-from-square"&gt;&lt;/span&gt;Register as ATP/PostDoc/PhD/ZAP&lt;/a&gt;&lt;/p&gt;&lt;/li&gt;
&lt;li&gt;&lt;p&gt;&lt;a class="falink reference external" href="https://forms.office.com/Pages/ResponsePage.aspx?id=qHxbaagtRUWi2kLQN4TlhSUE0WUIZ09JiP9GMZUlAWpUMTdUNzEyTzBMTTk5OEU4WVRERUNTVjJUQi4u"&gt;&lt;span class="fa-solid fa-up-right-from-square"&gt;&lt;/span&gt;Register as a VUB master/bachelor student&lt;/a&gt;&lt;/p&gt;&lt;/li&gt;
&lt;/ul&gt;
&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;In addition to these training sessions organized by the VUB-HPC team, all our
users have free access to the wide range of training courses organized across
the VSC. Check them out at &lt;a class="vsclink reference external" href="https://www.vscentrum.be/training"&gt;&lt;span class="sd-badge"&gt;&lt;span&gt;VSCweb&lt;/span&gt;&lt;/span&gt;VSC Training&lt;/a&gt;.&lt;/p&gt;
&lt;p&gt;Contact us at &lt;a class="falink reference external" href="mailto:hpc&amp;#37;&amp;#52;&amp;#48;vub&amp;#46;be"&gt;&lt;span class="fa-solid fa-envelope"&gt;&lt;/span&gt;VUB-HPC Support&lt;/a&gt; if you have any comments or questions about these
events.&lt;/p&gt;
&lt;/section&gt;
</content>
    <link href="https://hpc.vub.be/news/2026/linux-hpc-training/"/>
    <summary>We are pleased to announce our annual on-site introductory training sessions,
held at the Brussels Humanities, Sciences &amp; Engineering Campus (Elsene).</summary>
    <category term="motd" label="motd"/>
    <category term="training" label="training"/>
    <published>2026-10-09T00:00:00+00:00</published>
  </entry>
  <entry>
    <id>https://hpc.vub.be/news/2026/vsc-gssi-training/</id>
    <title>14/10/2026: VSC training: Getting Scientific Software Installed</title>
    <updated>2026-10-05T00:00:00+00:00</updated>
    <author>
      <name>HPC Team</name>
    </author>
    <content type="html">&lt;section id="vsc-training-getting-scientific-software-installed"&gt;

&lt;p&gt;On Wednesday, 14 October 2026, VSC is organizing a training session in which we
will present various well-established tools and techniques for getting
scientific software installed. After this session, researchers will be able to
select the right tool for their use case and efficiently get started with
installing the software required for their scientific workloads.&lt;/p&gt;
&lt;p&gt;Getting the software, required to run your scientific workloads, installed on a
supercomputer can be a daunting task.&lt;/p&gt;
&lt;p&gt;There is a wide variety of tools and techniques to consider, and the best
option depends on various factors, including which software you need, which
system(s) you want to use, which programming language(s) the software is
implemented in, etc.&lt;/p&gt;
&lt;p&gt;This training session is based on a similar session that was held last year
(see &lt;a class="reference external" href="https://vscentrum.github.io/gssi-training/2025"&gt;https://vscentrum.github.io/gssi-training/2025&lt;/a&gt;), although it will be
organized slightly differently this time.&lt;/p&gt;
&lt;p&gt;In-person attendance at the Marie-Elisabeth Belpaire building in Brussels
(close to Brussels-North train station) is recommended and is available to a
limited number of participants. Virtual attendance via MS Teams is also
possible.&lt;/p&gt;
&lt;p&gt;Participation is free of charge, but registration is required for practical
reasons.&lt;/p&gt;
&lt;p&gt;You can register via the button below:&lt;/p&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-75 sd-mt-2 sd-mb-4 sd-ml-auto sd-mr-auto sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-header docutils"&gt;
&lt;p class="sd-card-text"&gt;Linux Introduction&lt;/p&gt;
&lt;/div&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;ul&gt;
&lt;li&gt;&lt;p class="sd-card-text"&gt;&lt;em&gt;date&lt;/em&gt;: &lt;strong&gt;Wednesday 14 October 2026&lt;/strong&gt;&lt;/p&gt;&lt;/li&gt;
&lt;li&gt;&lt;p class="sd-card-text"&gt;&lt;em&gt;time&lt;/em&gt;: 9:00-17:00&lt;/p&gt;&lt;/li&gt;
&lt;li&gt;&lt;p class="sd-card-text"&gt;&lt;em&gt;organizer&lt;/em&gt;: &lt;a class="vsclink reference external" href="https://www.vscentrum.be/"&gt;&lt;span class="sd-badge"&gt;&lt;span&gt;VSCweb&lt;/span&gt;&lt;/span&gt;Flemish Supercomputer Centre (VSC)&lt;/a&gt;&lt;/p&gt;&lt;/li&gt;
&lt;li&gt;&lt;p class="sd-card-text"&gt;&lt;em&gt;location&lt;/em&gt;:&lt;/p&gt;
&lt;div class="line-block"&gt;
&lt;div class="line"&gt;Belpaire - 03.Z.02 (3rd floor)&lt;/div&gt;
&lt;div class="line"&gt;Marie-Elisabeth Belpaire building (close to Brussels-North train station)&lt;/div&gt;
&lt;div class="line"&gt;Simon Bolivarlaan 17&lt;/div&gt;
&lt;div class="line"&gt;1000 Brussel&lt;/div&gt;
&lt;/div&gt;
&lt;/li&gt;
&lt;/ul&gt;
&lt;p class="sd-card-text"&gt;&lt;span class="sd-d-grid"&gt;&lt;a class="sd-sphinx-override sd-btn sd-text-wrap sd-btn-primary reference external" href="https://event.ugent.be/registration/gssi2026"&gt;&lt;span&gt;Register here&lt;/span&gt;&lt;/a&gt;&lt;/span&gt;&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;p&gt;More information, including a detailed agenda, is also available on the
registration page.&lt;/p&gt;
&lt;p&gt;We plan to record this session and make the recording available shortly
afterwards.&lt;/p&gt;
&lt;p&gt;Speakers:&lt;/p&gt;
&lt;ul class="simple"&gt;
&lt;li&gt;&lt;p&gt;Kenneth Hoste, Lara Peeters (HPC support team &amp;#64; Ghent University)&lt;/p&gt;&lt;/li&gt;
&lt;li&gt;&lt;p&gt;Alex Domingo, Sam Moors, Cintia Willemyns (HPC support team &amp;#64; Vrije
Universiteit Brussel)&lt;/p&gt;&lt;/li&gt;
&lt;li&gt;&lt;p&gt;Steven Vandenbrande, Maxime Van den Bossche (HPC support team &amp;#64; KU Leuven)&lt;/p&gt;&lt;/li&gt;
&lt;li&gt;&lt;p&gt;Robin Verschoren (HPC support team &amp;#64; University of Antwerp)&lt;/p&gt;&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;In case of problems or questions, please contact the organizers at &lt;a class="falink reference external" href="mailto:support&amp;#37;&amp;#52;&amp;#48;vscentrum&amp;#46;be"&gt;&lt;span class="fa-solid fa-up-right-from-square"&gt;&lt;/span&gt;VSC support&lt;/a&gt;.&lt;/p&gt;
&lt;div class="admonition seealso"&gt;
&lt;p class="admonition-title"&gt;See also&lt;/p&gt;
&lt;p&gt;An overview of upcoming &lt;a class="vsclink reference external" href="https://www.vscentrum.be/vsctraining"&gt;&lt;span class="sd-badge"&gt;&lt;span&gt;VSCweb&lt;/span&gt;&lt;/span&gt;training sessions organized by VSC&lt;/a&gt; .&lt;/p&gt;
&lt;/div&gt;
&lt;/section&gt;
</content>
    <link href="https://hpc.vub.be/news/2026/vsc-gssi-training/"/>
    <summary>On Wednesday, 14 October 2026, VSC is organizing a training session in which we
will present various well-established tools and techniques for getting
scientific software installed. After this session, researchers will be able to
select the right tool for their use case and efficiently get started with
installing the software required for their scientific workloads.</summary>
    <category term="event" label="event"/>
    <category term="motd" label="motd"/>
    <category term="training" label="training"/>
    <published>2026-10-05T00:00:00+00:00</published>
  </entry>
  <entry>
    <id>https://hpc.vub.be/news/2026/hydra-anansi-move/</id>
    <title>[live updates] VUB HPC clusters moving to Research Park Zellik</title>
    <updated>2026-09-11T00:00:00+00:00</updated>
    <author>
      <name>HPC Team</name>
    </author>
    <content type="html">&lt;section id="live-updates-vub-hpc-clusters-moving-to-research-park-zellik"&gt;

&lt;figure class="align-default"&gt;
&lt;img alt="https://hpc.vub.be/_images/penta-datacenter-01.jpg" src="https://hpc.vub.be/_images/penta-datacenter-01.jpg" /&gt;
&lt;/figure&gt;
&lt;p&gt;Hydra and Anansi will move to the data center in the
&lt;a class="reference external" href="https://www.vub.be/en/news/research-park-zellik-evolves-into-global-innovation-center"&gt;Research Park Zellik&lt;/a&gt;
on the week of &lt;strong&gt;September 7th&lt;/strong&gt;. The clusters will be fully shut down on Monday
September 7th at midnight and reopen to users a week later, on Monday
September 14th.&lt;/p&gt;
&lt;p&gt;During this period, it will &lt;strong&gt;not be possible to connect to Hydra or Anansi and
jobs will not run&lt;/strong&gt;. This restriction includes the following services:&lt;/p&gt;
&lt;ul class="simple"&gt;
&lt;li&gt;&lt;p&gt;SSH connections through the terminal interface&lt;/p&gt;&lt;/li&gt;
&lt;li&gt;&lt;p&gt;OnDemand sessions through &lt;em&gt;portal.hpc.vub.be&lt;/em&gt;&lt;/p&gt;&lt;/li&gt;
&lt;li&gt;&lt;p&gt;Remote sessions with tunneling such as VS Code applications&lt;/p&gt;&lt;/li&gt;
&lt;li&gt;&lt;p&gt;Globus collection &lt;em&gt;VSC VUB Hydra&lt;/em&gt;&lt;/p&gt;&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;Once the move starts we will publish regular updates on this same news post
with details on the progress of the operation.
See the &lt;a class="reference internal" href="../news/2026/hydra-anansi-move/#move-zellik-timeline"&gt;&lt;span class="std std-ref"&gt;Timeline of events&lt;/span&gt;&lt;/a&gt; and updates below!&lt;/p&gt;
&lt;section id="impact-on-storage"&gt;
&lt;span id="move-zellik-storage"&gt;&lt;/span&gt;&lt;h2&gt;Impact on Storage&lt;/h2&gt;
&lt;p&gt;We are currently taking backups of the scratch storage in Hydra prior to the
move. These special backups will guarantee that there is no data loss even if
some hardware is physically damaged in the process.&lt;/p&gt;
&lt;p&gt;The storage system for &lt;cite&gt;VSC_HOME&lt;/cite&gt; and &lt;cite&gt;VSC_DATA&lt;/cite&gt; is partially affected by this move.
This storage is not moving but needs to be reconfigured. Hence, there
will be a disconnection of &lt;cite&gt;VSC_HOME&lt;/cite&gt; and &lt;cite&gt;VSC_DATA&lt;/cite&gt; from
Monday September 7th at 10:00 (CEST) until 15:00 (CEST).
During this period, users will not be able to login to any VSC cluster
on other sites.&lt;/p&gt;
&lt;/section&gt;
&lt;section id="impact-on-compute"&gt;
&lt;h2&gt;Impact on Compute&lt;/h2&gt;
&lt;p&gt;Users urgently needing compute time during the move can use the UGent Tier-2
systems as they are similar to ours. Check out the &lt;a class="reference external" href="https://docs.vscentrum.be/gent/tier2_hardware.html"&gt;VSC documentation&lt;/a&gt; on how to access them,
and the &lt;a class="reference external" href="https://hpcugent.github.io/vsc_user_docs/HPC/Gent/Linux/"&gt;HPC-UGent documentation&lt;/a&gt; for usage info.&lt;/p&gt;
&lt;p&gt;The last 5 days before the move, only jobs that can end before September 7th at
00:00 (CEST) will start. Jobs left in the queue before the move will be kept
in the queue and will automatically start once the move is finished and the
cluster is back online.&lt;/p&gt;
&lt;/section&gt;
&lt;section id="datacenter-in-research-park-zellik"&gt;
&lt;h2&gt;Datacenter in Research Park Zellik&lt;/h2&gt;
&lt;p&gt;The change of location from the data center room in building G of Etterbeek
campus to a modern data center such as &lt;a class="reference external" href="https://penta-infra.com/data-centers/brussels/"&gt;Penta Infra BRU01&lt;/a&gt;
will bring improved infrastructure at all levels. Greener and more stable power
supply, more efficient cooling and better security. Hydra and Anansi will not
share the space of the &lt;a class="reference external" href="https://www.vscentrum.be/post/vsc-inaugurates-sofia-the-new-flemish-tier-1-supercomputer"&gt;VSC Tier-1 cluster sofia&lt;/a&gt;
though, they will be placed in a different room exclusively used by VUB
alongside other systems of the university.&lt;/p&gt;
&lt;/section&gt;
&lt;section id="timeline-of-events"&gt;
&lt;span id="move-zellik-timeline"&gt;&lt;/span&gt;&lt;h2&gt;Timeline of events&lt;/h2&gt;
&lt;p&gt;The timeline below shows the main milestones during this operation and it will
be updated regularly. We will also notify of any changes to the planned
schedule.&lt;/p&gt;
&lt;p&gt;If you have any questions or concerns about the move, please contact &lt;a class="falink reference external" href="mailto:hpc&amp;#37;&amp;#52;&amp;#48;vub&amp;#46;be"&gt;&lt;span class="fa-solid fa-envelope"&gt;&lt;/span&gt;VUB-HPC Support&lt;/a&gt;.
User support will remain fully operational during the move.&lt;/p&gt;
&lt;div class="pst-scrollable-table-container"&gt;&lt;table class="table table-left" id="id1"&gt;
&lt;caption&gt;&lt;span class="caption-text"&gt;Timeline of move operation&lt;/span&gt;&lt;/caption&gt;
&lt;colgroup&gt;
&lt;col style="width: 10.0%" /&gt;
&lt;col style="width: 10.0%" /&gt;
&lt;col style="width: 60.0%" /&gt;
&lt;col style="width: 20.0%" /&gt;
&lt;/colgroup&gt;
&lt;thead&gt;
&lt;tr class="row-odd"&gt;&lt;th class="head"&gt;&lt;p&gt;Date&lt;/p&gt;&lt;/th&gt;
&lt;th class="head"&gt;&lt;p&gt;Time&lt;/p&gt;&lt;/th&gt;
&lt;th class="head"&gt;&lt;p&gt;Action&lt;/p&gt;&lt;/th&gt;
&lt;th class="head"&gt;&lt;p&gt;Status&lt;/p&gt;&lt;/th&gt;
&lt;/tr&gt;
&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr class="row-even"&gt;&lt;td&gt;&lt;p&gt;04/09&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;17:00&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;Complete inventory, labelling and order of new components&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;&lt;a class="sd-sphinx-override sd-badge sd-bg-success sd-bg-text-success reference internal" href="../news/2026/hydra-anansi-move/#update-04-09"&gt;&lt;span class="std std-ref"&gt;✓ Completed&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr class="row-odd"&gt;&lt;td&gt;&lt;p&gt;07/09&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;00:00&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;Hydra and Anansi clusters shut down&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;&lt;span class="sd-sphinx-override sd-badge sd-bg-success sd-bg-text-success"&gt;✓ Completed&lt;/span&gt;&lt;/p&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr class="row-even"&gt;&lt;td&gt;&lt;p&gt;07/09&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;06:00&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;Final data sync of &lt;em&gt;VSC_SCRATCH&lt;/em&gt; backup completes (see &lt;a class="reference internal" href="../news/2026/hydra-anansi-move/#move-zellik-storage"&gt;&lt;span class="std std-ref"&gt;Impact on Storage&lt;/span&gt;&lt;/a&gt;)&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;&lt;span class="sd-sphinx-override sd-badge sd-bg-success sd-bg-text-success"&gt;✓ Completed&lt;/span&gt;&lt;/p&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr class="row-odd"&gt;&lt;td&gt;&lt;p&gt;07/09&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;15:00&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;Login to non-VUB VSC clusters re-established for VUB users (see &lt;a class="reference internal" href="../news/2026/hydra-anansi-move/#move-zellik-storage"&gt;&lt;span class="std std-ref"&gt;Impact on Storage&lt;/span&gt;&lt;/a&gt;)&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;&lt;a class="sd-sphinx-override sd-badge sd-bg-success sd-bg-text-success reference internal" href="../news/2026/hydra-anansi-move/#update-07-09"&gt;&lt;span class="std std-ref"&gt;✓ Completed&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr class="row-even"&gt;&lt;td&gt;&lt;p&gt;07/09&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;18:00&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;Hardware arrives at Research Park Zellik (hopefully in one piece)&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;&lt;a class="sd-sphinx-override sd-badge sd-bg-success sd-bg-text-success reference internal" href="../news/2026/hydra-anansi-move/#update-07-09"&gt;&lt;span class="std std-ref"&gt;✓ Completed&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr class="row-odd"&gt;&lt;td&gt;&lt;p&gt;08/09&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;17:00&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;Storage of &lt;em&gt;VSC_SCRATCH&lt;/em&gt; cabled and operational&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;&lt;a class="sd-sphinx-override sd-badge sd-bg-success sd-bg-text-success reference internal" href="../news/2026/hydra-anansi-move/#update-09-09"&gt;&lt;span class="std std-ref"&gt;✓ Completed&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr class="row-even"&gt;&lt;td&gt;&lt;p&gt;10/09&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;17:00&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;Compute nodes of Hydra and Anansi cabled and operational&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;&lt;a class="sd-sphinx-override sd-badge sd-bg-success sd-bg-text-success reference internal" href="../news/2026/hydra-anansi-move/#update-11-09"&gt;&lt;span class="std std-ref"&gt;✓ Completed&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr class="row-odd"&gt;&lt;td&gt;&lt;p&gt;11/09&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;17:00&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;Login to Anansi and Hydra re-established (terminal and OnDemand)&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;&lt;a class="sd-sphinx-override sd-badge sd-bg-success sd-bg-text-success reference internal" href="../news/2026/hydra-anansi-move/#update-11-09"&gt;&lt;span class="std std-ref"&gt;✓ Completed&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;tr class="row-even"&gt;&lt;td&gt;&lt;p&gt;14/09&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;17:00&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;Release of compute partitions of Anansi and Hydra to users&lt;/p&gt;&lt;/td&gt;
&lt;td&gt;&lt;p&gt;&lt;a class="sd-sphinx-override sd-badge sd-bg-success sd-bg-text-success reference internal" href="../news/2026/hydra-anansi-move/#update-11-09"&gt;&lt;span class="std std-ref"&gt;✓ Completed&lt;/span&gt;&lt;/a&gt;&lt;/p&gt;&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;div class="note update admonition" id="update-04-09"&gt;
&lt;p class="admonition-title"&gt;Updated on 04/09/2026&lt;/p&gt;
&lt;p&gt;Most preparations for the move of the clusters next Monday are ready. We
reviewed our inventory of components, all systems moving to the new
data-center are clearly labelled to be easily located and we already
received the delivery of almost all new components needed to connect
everything in the new location.&lt;/p&gt;
&lt;p&gt;We completed the first full backup of &lt;em&gt;VSC_SCRATCH&lt;/em&gt;, which will receive a
final data sync once the clusters are shut down.&lt;/p&gt;
&lt;/div&gt;
&lt;div class="sd-container-fluid sd-sphinx-override sd-mb-4 docutils"&gt;
&lt;div class="sd-row sd-row-cols-1 sd-row-cols-xs-1 sd-row-cols-sm-1 sd-row-cols-md-2 sd-row-cols-lg-2 sd-g-4 sd-g-xs-4 sd-g-sm-4 sd-g-md-4 sd-g-lg-4 docutils"&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id2"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_cables_01.jpg" src="https://hpc.vub.be/_images/move_zellik_cables_01.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;We got meters of new network cables. The network fabric in the
data-center of RPZ is different from in G0, so we needed to adapt the
connections of our systems.&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id3"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_stickers_01.jpg" src="https://hpc.vub.be/_images/move_zellik_stickers_01.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;Racks are color coded to ease the transition of the nodes to their
new destination. The &lt;cite&gt;zen5_mpi&lt;/cite&gt; nodes go to the yellow rack.&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id4"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_stickers_03.jpg" src="https://hpc.vub.be/_images/move_zellik_stickers_03.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;Nodes are labelled front and back. This is the back of some
&lt;cite&gt;ampere_gpu&lt;/cite&gt; nodes that go to the blue rack.&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id5"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_stickers_02.jpg" src="https://hpc.vub.be/_images/move_zellik_stickers_02.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;The &lt;cite&gt;zen4&lt;/cite&gt; nodes go to the green rack.&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="note update admonition" id="update-07-09"&gt;
&lt;p class="admonition-title"&gt;Updated on 07/09/2026&lt;/p&gt;
&lt;p&gt;&lt;strong&gt;15:30&lt;/strong&gt; Compute nodes of Anansi and Hydra, the scratch storage and other
components already left G0 and are travelling to Zellik. So far everything
is developing according to plan. The clusters should arrive at their new
data-center in couple hours.&lt;/p&gt;
&lt;p&gt;In the meantime, the re-configuration of the storage system for &lt;cite&gt;VSC_HOME&lt;/cite&gt;
and &lt;cite&gt;VSC_DATA&lt;/cite&gt; has been completed successfully. VUB users can now login to
the VSC clusters of UGent and UAntwerp and from tomorrow to KU Leuven.&lt;/p&gt;
&lt;p&gt;&lt;strong&gt;20:00&lt;/strong&gt; Transport to Zellik was uneventful. All carriages arrived at their
destination in good condition.&lt;/p&gt;
&lt;/div&gt;
&lt;div class="sd-container-fluid sd-sphinx-override sd-mb-4 docutils"&gt;
&lt;div class="sd-row sd-row-cols-1 sd-row-cols-xs-1 sd-row-cols-sm-1 sd-row-cols-md-2 sd-row-cols-lg-2 sd-g-4 sd-g-xs-4 sd-g-sm-4 sd-g-md-4 sd-g-lg-4 docutils"&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id6"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_g0_01.jpg" src="https://hpc.vub.be/_images/move_zellik_g0_01.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;Work started rather early today with the disconnection and proper
removal of all power cords and network cables. The years of
accumulated changes resulted in a bit of spaghetti to untangle in some
racks.&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id7"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_g0_02.jpg" src="https://hpc.vub.be/_images/move_zellik_g0_02.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;Network cables being sorted on the ground. The clusters have three
different networks: &lt;em&gt;maintenance&lt;/em&gt;, &lt;em&gt;main Ethernet&lt;/em&gt; and &lt;em&gt;fast
InfiniBand&lt;/em&gt;; each one with its own type of cables. Here there are the
cables of a single rack, Hydra and Anansi occupy six racks in G0.&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id8"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_g0_03.jpg" src="https://hpc.vub.be/_images/move_zellik_g0_03.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;Everything fits in a single truck.&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id9"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_g0_04.jpg" src="https://hpc.vub.be/_images/move_zellik_g0_04.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;All nodes are very well protected fully stuffed in foam. They’ll have
a cozy trip.&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id10"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_g0_05.jpg" src="https://hpc.vub.be/_images/move_zellik_g0_05.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;Transport carriages in building G waiting to be loaded onto the truck.&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id11"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_g0_06.jpg" src="https://hpc.vub.be/_images/move_zellik_g0_06.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;An HPC needs many many power cords. Here lays a fraction of all
power cords removed today.&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="note update admonition" id="update-08-09"&gt;
&lt;p class="admonition-title"&gt;Updated on 08/09/2026&lt;/p&gt;
&lt;p&gt;Today we got all systems placed in their new racks. In total around 80
&lt;em&gt;boxes&lt;/em&gt; including all compute nodes of Hydra and Anansi, login nodes,
scratch storage and service systems. We have also started with the cabling,
which will take multiple days.&lt;/p&gt;
&lt;p&gt;The scratch storage seems to have withstand transportation without a scratch.
Upon cabling and powering it up, all drives show good health with no sign of
errors. However, we still lack the network connectivity to properly check
the filesystem, so we will not set this milestone as completed yet. But it
is almost done.&lt;/p&gt;
&lt;/div&gt;
&lt;div class="sd-container-fluid sd-sphinx-override sd-mb-4 docutils"&gt;
&lt;div class="sd-row sd-row-cols-1 sd-row-cols-xs-1 sd-row-cols-sm-1 sd-row-cols-md-2 sd-row-cols-lg-2 sd-g-4 sd-g-xs-4 sd-g-sm-4 sd-g-md-4 sd-g-lg-4 docutils"&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id12"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_penta_01.jpg" src="https://hpc.vub.be/_images/move_zellik_penta_01.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;The structure of the new data center in RPZ is peculiar. Cooling
infrastructure is located in a separate room right below the computer
racks and the hot air generated by the cluster is just taken by the
cooling through the floor. Which is large metal grid. Hence, working
with small components such as screws or cable straps can be quite
nerve wracking. Items that fall through the grid have a 4-5 meter free
fall.&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id13"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_penta_02.jpg" src="https://hpc.vub.be/_images/move_zellik_penta_02.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;First step was to place all nodes in their new racks. These are the
&lt;em&gt;zen5_mpi&lt;/em&gt; with the InfiniBand NDR switch.&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id14"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_penta_03.jpg" src="https://hpc.vub.be/_images/move_zellik_penta_03.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;We already started with the cabling once all systems where in the
racks. All nodes use at least 2 power cords connected to different
power delivery units (PDU) on the rack for redundancy. Left one is
red, right one is blue.&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id15"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_penta_04.jpg" src="https://hpc.vub.be/_images/move_zellik_penta_04.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;All hard drives on the scratch storage show green lights, meaning the
they are healthy with no hardware errors. Which makes us very happy.&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="note update admonition" id="update-09-09"&gt;
&lt;p class="admonition-title"&gt;Updated on 09/09/2026&lt;/p&gt;
&lt;p&gt;We confirmed the good health of our scratch storage! No data is lost and we
can avoid spending time restoring any backups. We just had a bit of a hiccup
to get back the full redundancy across all hard drives, but by performing an
obscure dancing ritual with the storage cables, we got it working.&lt;/p&gt;
&lt;p&gt;Regarding the compute nodes, we made good progress with their cabling. All
systems have power and connections to the maintenance and main networks.
This allowed us to already boot-up some systems and carry out initial tests
today. So far, we have not detected any hardware damage to any of the
compute nodes.&lt;/p&gt;
&lt;p&gt;Tomorrow we will complete the cabling of the fast Infiniband network, which
is the last step remaining to complete the hardware installation of the
clusters in the data center at RPZ.&lt;/p&gt;
&lt;/div&gt;
&lt;div class="sd-container-fluid sd-sphinx-override sd-mb-4 docutils"&gt;
&lt;div class="sd-row sd-row-cols-1 sd-row-cols-xs-1 sd-row-cols-sm-1 sd-row-cols-md-2 sd-row-cols-lg-2 sd-g-4 sd-g-xs-4 sd-g-sm-4 sd-g-md-4 sd-g-lg-4 docutils"&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id16"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_penta_05.jpg" src="https://hpc.vub.be/_images/move_zellik_penta_05.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;Infiniband network cables labelled and ready to be installed.&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id17"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_penta_06.jpg" src="https://hpc.vub.be/_images/move_zellik_penta_06.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;Kris verifying for the thousandth time the correctness of all network
connections on a beautiful spreadsheet we made with many columns, and
rows, and colors and alphanumeric codes. Pure art.&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id18"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_penta_07.jpg" src="https://hpc.vub.be/_images/move_zellik_penta_07.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;Alex and Hugues installing 10 meter long optic fibers to connect the
scratch storage to the racks on the other side of the corridor. Those
fibers love to get tangled.&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id19"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_penta_08.jpg" src="https://hpc.vub.be/_images/move_zellik_penta_08.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;We started powering compute nodes. The orange light means there is
power but the system has not been booted up yet. These are the
&lt;em&gt;hopper_gpu&lt;/em&gt; nodes of Hydra (top) with the &lt;em&gt;ada_gpu&lt;/em&gt; of Anansi
(middle).&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="note update admonition" id="update-10-09"&gt;
&lt;p class="admonition-title"&gt;Updated on 10/09/2026&lt;/p&gt;
&lt;p&gt;Today we have bad news, the old Infiniband EDR network switches have not
survived the move. We have these two switches since 2018 and they have been
the backbone of the Infiniband network of many of Hydra’s partitions,
providing up to 100 Gbps of fast interconnect to the old &lt;em&gt;ivybridge_mpi&lt;/em&gt; and
&lt;em&gt;skylake_mpi&lt;/em&gt; as well as the still active &lt;em&gt;ampere_gpu&lt;/em&gt;. We are not fully
surprised by this event, apart from the evident age of these devices, we
were aware that they suffered advanced wearing on their internal SSD.
However, we were not expecting both switches to die at the same time.
Tomorrow we will try to get the amperes online with a third IB-EDR switch we
have in storage, which was once part of the former VSC Tier-1 cluster
&lt;a class="reference external" href="https://docs.vscentrum.be/leuven/old_hardware/breniac/breniac_hardware.html"&gt;BrENIAC&lt;/a&gt;.&lt;/p&gt;
&lt;p&gt;Fortunately, Hydra is less reliant on the old EDR-IB network and all new
partitions with Infiniband such as &lt;em&gt;zen5_mpi&lt;/em&gt; and &lt;em&gt;hopper_gpu&lt;/em&gt; use
last-generation NDR with speeds up to 400 Gbps. Today we have installed the
remaining Infiniband cables on those partitions and the storage, which bring
the cabling tasks almost to an end.&lt;/p&gt;
&lt;p&gt;On the positive side, the login nodes and almost all compute partitions are
operational; with the exception of &lt;em&gt;ampere_gpu&lt;/em&gt; due to the IB-EDR situation
and &lt;em&gt;zen5_himem&lt;/em&gt; which still lacks a few cables. This means that we can
already start testing the operational compute nodes to verify their
performance. We expect to re-open the login nodes during Friday as planned,
and compute partitions will be released as soon as they are validated.&lt;/p&gt;
&lt;/div&gt;
&lt;div class="sd-container-fluid sd-sphinx-override sd-mb-4 docutils"&gt;
&lt;div class="sd-row sd-row-cols-1 sd-row-cols-xs-1 sd-row-cols-sm-1 sd-row-cols-md-2 sd-row-cols-lg-2 sd-g-4 sd-g-xs-4 sd-g-sm-4 sd-g-md-4 sd-g-lg-4 docutils"&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id20"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_penta_09.jpg" src="https://hpc.vub.be/_images/move_zellik_penta_09.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;R.I.P. Infiniband EDR switches. 2018-2026.&lt;/span&gt;&lt;/p&gt;
&lt;div class="legend"&gt;
&lt;p class="sd-card-text"&gt;&lt;em&gt;“I’m Not Crying, You’re Crying”&lt;/em&gt;&lt;/p&gt;
&lt;/div&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id21"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_penta_10.jpg" src="https://hpc.vub.be/_images/move_zellik_penta_10.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;Hoppers (Hydra) and Adas (Anansi) getting their Infiniband NDR cables.
These long black cables are 5m long because they need to go from the
nodes on the right of the picture, up to the rails above and to their
neighbour rack. But at the same time these are very thick copper
cables that hate to be twisted and bent. The delicate fingers of an IT
engineer are not prepared for this.&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id22"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_penta_11.jpg" src="https://hpc.vub.be/_images/move_zellik_penta_11.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;One of the best features of the new data center in RPZ is that the
doors of the racks open almost 180 degrees. Believe it or not, this
helps immensely to work in its narrow corridors. We love it!&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id23"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_penta_12.jpg" src="https://hpc.vub.be/_images/move_zellik_penta_12.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;The true heroes of today. A red security tag and a anti-shock wrist
strap that have been used in top MacGyver fashion to recover a lost
cable strap, last of its kind, that fell through the grid floor and
got stuck on a cooling inlet below it.&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="note update admonition" id="update-11-09"&gt;
&lt;p class="admonition-title"&gt;Updated on 11/09/2026&lt;/p&gt;
&lt;p&gt;&lt;strong&gt;13:00&lt;/strong&gt; The OnDemand portal and terminal interface are open! Tests on
running partitions have been positive. Performance is on par or better than
before the move and we have not spotted any problem with the hardware. So
all partitions except &lt;em&gt;ampere_gpu&lt;/em&gt; are online and available to users. Quite
ahead of our original planning.&lt;/p&gt;
&lt;p&gt;&lt;strong&gt;19:00&lt;/strong&gt; The replacement of the dead Infiniband EDR switches with our spare
from BrENIAC has been successful. The spare switch is in working condition
and all &lt;em&gt;ampere_gpu&lt;/em&gt; nodes now have Infiniband network. So this partition is
now online as well and available to users.&lt;/p&gt;
&lt;p&gt;This completes the migration of Hydra and Anansi to RPZ. All compute
partitions and services are online.&lt;/p&gt;
&lt;/div&gt;
&lt;div class="sd-container-fluid sd-sphinx-override sd-mb-4 docutils"&gt;
&lt;div class="sd-row sd-row-cols-1 sd-row-cols-xs-1 sd-row-cols-sm-1 sd-row-cols-md-2 sd-row-cols-lg-2 sd-g-4 sd-g-xs-4 sd-g-sm-4 sd-g-md-4 sd-g-lg-4 docutils"&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id24"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_penta_13.jpg" src="https://hpc.vub.be/_images/move_zellik_penta_13.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;An unusual view of Hydra from below, taken from its cooling room.&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id25"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_penta_14.jpg" src="https://hpc.vub.be/_images/move_zellik_penta_14.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;The cooling room below the data center room with the racks. Those big
grey boxes are big heat exchangers.&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id26"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_penta_15.jpg" src="https://hpc.vub.be/_images/move_zellik_penta_15.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;Hacking station to fix a stubborn compute node refusing to boot. The
keyboard on the image has an azerty layout and the shell on the screen
uses an en-US localization. Typing our symbol-rich 16 character long
root password has been the most difficult we carried this week by far!&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id27"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_penta_16.jpg" src="https://hpc.vub.be/_images/move_zellik_penta_16.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;Repairing the hardware of a compute node on top of the grid floor with
steady hands and no sweating to not lose any of those tiny screws or any
screwdriver bits to the void below.&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;div class="sd-col sd-d-flex-row docutils"&gt;
&lt;div class="sd-card sd-sphinx-override sd-w-100 sd-shadow-sm docutils"&gt;
&lt;div class="sd-card-body docutils"&gt;
&lt;figure class="align-default" id="id28"&gt;
&lt;img alt="https://hpc.vub.be/_images/move_zellik_penta_17.jpg" src="https://hpc.vub.be/_images/move_zellik_penta_17.jpg" /&gt;
&lt;figcaption&gt;
&lt;p&gt;&lt;span class="caption-text"&gt;The calm after the storm.&lt;/span&gt;&lt;/p&gt;
&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/div&gt;
&lt;/section&gt;
&lt;/section&gt;
</content>
    <link href="https://hpc.vub.be/news/2026/hydra-anansi-move/"/>
    <summary>Hydra and Anansi will move to the data center in the
Research Park Zellik
on the week of September 7th. The clusters will be fully shut down on Monday
September 7th at midnight and reopen to users a week later, on Monday
September 14th.</summary>
    <category term="hardware" label="hardware"/>
    <category term="hydra" label="hydra"/>
    <category term="maintenance" label="maintenance"/>
    <category term="motd" label="motd"/>
    <published>2026-08-18T00:00:00+00:00</published>
  </entry>
  <entry>
    <id>https://hpc.vub.be/news/2026/hydra-anansi-system-upgrade/</id>
    <title>System update rollout on Hydra and Anansi</title>
    <updated>2026-07-17T00:00:00+00:00</updated>
    <author>
      <name>HPC Team</name>
    </author>
    <content type="html">&lt;section id="system-update-rollout-on-hydra-and-anansi"&gt;

&lt;p&gt;We are updating the operating system on Hydra and Anansi with the latest
security and bug fixes. The rollout will start on &lt;strong&gt;Saturday July 18th at
03:00 CEST&lt;/strong&gt; and will be gradually carried out in the coming days. This
operation has a minimal impact on our users: compute capacity will be
slightly lower during the update, but there will be no downtime of the
clusters and all job queues will remain operational.&lt;/p&gt;
&lt;p&gt;We will also update the login nodes of Hydra and Anansi during this window.
Access to the clusters will be briefly unavailable to users during the night
of Saturday on Sunday, and all user sessions on the login nodes will be
disconnected, but running jobs will not be impacted.&lt;/p&gt;
&lt;p&gt;These operations are part of the regular updates to keep VUB-HPC
infrastructure modern and up to current standards. Please contact us at
&lt;a class="falink reference external" href="mailto:hpc&amp;#37;&amp;#52;&amp;#48;vub&amp;#46;be"&gt;&lt;span class="fa-solid fa-envelope"&gt;&lt;/span&gt;VUB-HPC Support&lt;/a&gt; if you have any comments or questions about these changes.&lt;/p&gt;
&lt;/section&gt;
</content>
    <link href="https://hpc.vub.be/news/2026/hydra-anansi-system-upgrade/"/>
    <summary>We are updating the operating system on Hydra and Anansi with the latest
security and bug fixes. The rollout will start on Saturday July 18th at
03:00 CEST and will be gradually carried out in the coming days. This
operation has a minimal impact on our users: compute capacity will be
slightly lower during the update, but there will be no downtime of the
clusters and all job queues will remain operational.</summary>
    <category term="anansi" label="anansi"/>
    <category term="hydra" label="hydra"/>
    <category term="maintenance" label="maintenance"/>
    <category term="motd" label="motd"/>
    <published>2026-07-17T00:00:00+00:00</published>
  </entry>
  <entry>
    <id>https://hpc.vub.be/news/2026/july-hydra-sofia-security-shutdown/</id>
    <title>Security lockdown of VUB-HPC clusters</title>
    <updated>2026-07-06T00:00:00+00:00</updated>
    <author>
      <name>HPC Team</name>
    </author>
    <content type="html">&lt;section id="security-lockdown-of-vub-hpc-clusters"&gt;

&lt;div class="note update admonition"&gt;
&lt;p class="admonition-title"&gt;Updated on 06/07/2026&lt;/p&gt;
&lt;p&gt;14:00 CEST: Operations on Tier-1 cluster sofia are complete and the
system is now available to users. There is no indication that any breach of
security has occurred in any of VUB-HPC systems.&lt;/p&gt;
&lt;/div&gt;
&lt;div class="note update admonition"&gt;
&lt;p class="admonition-title"&gt;Updated on 06/07/2026&lt;/p&gt;
&lt;p&gt;09:00 CEST: We already patched the issue on the Tier-2 clusters (Hydra and
Anansi) ahead of schedule. Both Tier-2 clusters are again accessible. All
jobs that could not finished before Monday morning have been re-queued.&lt;/p&gt;
&lt;/div&gt;
&lt;div class="note update admonition"&gt;
&lt;p class="admonition-title"&gt;Updated on 05/07/2026&lt;/p&gt;
&lt;p&gt;17:00 CEST: We are in the process of deploying the required system updates
to fix the security issues disclosed on Friday.&lt;/p&gt;
&lt;p&gt;Hydra and Anansi are expected to be fully online by Monday July 6th at 17:00
CEST&lt;/p&gt;
&lt;p&gt;Sofia is expected to be fully online by Monday July 6th at 12:00 CEST&lt;/p&gt;
&lt;/div&gt;
&lt;p&gt;&lt;strong&gt;Access to the HPC clusters of VUB (Hydra, Anansi) and the VSC Tier-1 cluster
sofia is closed for security reasons until further notice.&lt;/strong&gt;&lt;/p&gt;
&lt;p&gt;A new critical vulnerability was just announced that affects our systems. We
decided to quickly close all access to our HPC clusters preemptively to avoid
any damage on the system and user’s data in it. At the time of closure, no
intrusion in our HPC clusters has occurred.&lt;/p&gt;
&lt;p&gt;This measure includes the following services:&lt;/p&gt;
&lt;ul class="simple"&gt;
&lt;li&gt;&lt;p&gt;SSH connections through the terminal interface&lt;/p&gt;&lt;/li&gt;
&lt;li&gt;&lt;p&gt;OnDemand sessions through &lt;em&gt;portal.hpc.vub.be&lt;/em&gt;&lt;/p&gt;&lt;/li&gt;
&lt;li&gt;&lt;p&gt;Remote sessions with tunneling such as VS Code applications&lt;/p&gt;&lt;/li&gt;
&lt;/ul&gt;
&lt;p&gt;All active sessions in our clusters have been terminated as well. Compute nodes
and the job scheduler will continue to process jobs in the queue. The only jobs
canceled are those that involve remote sessions with tunneling through OnDemand.&lt;/p&gt;
&lt;p&gt;Users that urgently need to access their data, can do so through the
&lt;a class="reference external" href="https://app.globus.org"&gt;Globus&lt;/a&gt; platform. Please check our documentation on
&lt;a class="vsclink reference external" href="https://docs.vscentrum.be/globus/index.html"&gt;&lt;span class="sd-badge"&gt;&lt;span&gt;VSCdoc&lt;/span&gt;&lt;/span&gt;Globus&lt;/a&gt; if you are not familiar with it.&lt;/p&gt;
&lt;p&gt;We are currently working on solving this new critical vulnerability on all our
systems as soon as possible. However, we cannot yet provide a timeline for the
complete resolution of this issue as we still need to complete our
investigation on it. We will keep this post up to date with any progress on
this issue.&lt;/p&gt;
&lt;p&gt;For any comments or questions, please contact us at &lt;a class="falink reference external" href="mailto:hpc&amp;#37;&amp;#52;&amp;#48;vub&amp;#46;be"&gt;&lt;span class="fa-solid fa-envelope"&gt;&lt;/span&gt;VUB-HPC Support&lt;/a&gt;.&lt;/p&gt;
&lt;/section&gt;
</content>
    <link href="https://hpc.vub.be/news/2026/july-hydra-sofia-security-shutdown/"/>
    <summary>14:00 CEST: Operations on Tier-1 cluster sofia are complete and the
system is now available to users. There is no indication that any breach of
security has occurred in any of VUB-HPC systems.</summary>
    <category term="VSC" label="VSC"/>
    <category term="hydra" label="hydra"/>
    <category term="security" label="security"/>
    <category term="sofia" label="sofia"/>
    <published>2026-07-04T00:00:00+00:00</published>
  </entry>
  <entry>
    <id>https://hpc.vub.be/news/2026/minor-system-slurm-upgrade/</id>
    <title>System update rollout on VUB-HPC clusters</title>
    <updated>2026-05-22T00:00:00+00:00</updated>
    <author>
      <name>HPC Team</name>
    </author>
    <content type="html">&lt;section id="system-update-rollout-on-vub-hpc-clusters"&gt;

&lt;p&gt;We are updating the operating system and Slurm scheduler on Hydra, Anansi and
&lt;strong&gt;sofia&lt;/strong&gt; with the latest security and bug fixes. The rollout will start on
&lt;strong&gt;Friday May 22nd at 14:00 CEST&lt;/strong&gt; and will be gradually carried out on all
VUB-HPC clusters in the following days. This operation has a minimal impact on
our users: compute capacity will be slightly lower during the update, but there
will be no downtime of the clusters and all job queues will remain operational.&lt;/p&gt;
&lt;p&gt;On Saturday 23rd at 03:00 CEST we will also update the login nodes of Hydra and
Anansi. During this upgrade, access to the clusters will be unavailable to
users for approximately 30 minutes. All user sessions on the login nodes will
be disconnected, but running jobs will not be impacted.&lt;/p&gt;
&lt;p&gt;This update of the operating system brings the compute nodes to the most
recent version of Rocky Linux, including all current security updates and
new versions of low-level drivers for the storage, network and GPUs. In
addition to the OS upgrade, Slurm will also receive a minor upgrade with
several fixes and some improvements to the job scheduler. There will be no
changes to your job scripts or how you use the cluster.&lt;/p&gt;
&lt;p&gt;These operations are part of the regular updates to keep VUB-HPC infrastructure
modern and up to current standards. Please contact us at &lt;a class="falink reference external" href="mailto:hpc&amp;#37;&amp;#52;&amp;#48;vub&amp;#46;be"&gt;&lt;span class="fa-solid fa-envelope"&gt;&lt;/span&gt;VUB-HPC Support&lt;/a&gt; if you have
any comments or questions about these changes.&lt;/p&gt;
&lt;/section&gt;
</content>
    <link href="https://hpc.vub.be/news/2026/minor-system-slurm-upgrade/"/>
    <summary>We are updating the operating system and Slurm scheduler on Hydra, Anansi and
sofia with the latest security and bug fixes. The rollout will start on
Friday May 22nd at 14:00 CEST and will be gradually carried out on all
VUB-HPC clusters in the following days. This operation has a minimal impact on
our users: compute capacity will be slightly lower during the update, but there
will be no downtime of the clusters and all job queues will remain operational.</summary>
    <category term="anansi" label="anansi"/>
    <category term="hydra" label="hydra"/>
    <category term="maintenance" label="maintenance"/>
    <category term="motd" label="motd"/>
    <category term="sofia" label="sofia"/>
    <published>2026-05-22T00:00:00+00:00</published>
  </entry>
  <entry>
    <id>https://hpc.vub.be/news/2026/tier-1-submission-guide/</id>
    <title>19 May 2026: Online information session for Tier-1 project applications</title>
    <updated>2026-05-12T00:00:00+00:00</updated>
    <author>
      <name>HPC Team</name>
    </author>
    <content type="html">&lt;section id="may-2026-online-information-session-for-tier-1-project-applications"&gt;

&lt;p&gt;We are organizing an online information session for VUB users interested in
submitting a Tier-1 project application. It takes place online on 19 May at
14:00. Everyone is welcome to join the session via Microsoft Teams using the
following link:
&lt;a class="reference external" href="https://teams.microsoft.com/meet/342738294056735?p=zJOKmdywWZdBwyIZwM"&gt;https://teams.microsoft.com/meet/342738294056735?p=zJOKmdywWZdBwyIZwM&lt;/a&gt;&lt;/p&gt;
&lt;p&gt;The next Tier-1 application cutoff date, 1 June, is approaching quickly. We
encourage all big HPC users to consider submitting a project application.
Please contact &lt;a class="reference external" href="mailto:vsc-support&amp;#37;&amp;#52;&amp;#48;hpc&amp;#46;vub&amp;#46;be"&gt;vsc-support&lt;span&gt;&amp;#64;&lt;/span&gt;hpc&lt;span&gt;&amp;#46;&lt;/span&gt;vub&lt;span&gt;&amp;#46;&lt;/span&gt;be&lt;/a&gt; if you would like access to our new
&lt;code class="docutils literal notranslate"&gt;&lt;span class="pre"&gt;sofia&lt;/span&gt;&lt;/code&gt; Tier-1 cluster to run benchmarks in preparation for the 1 June
application cutoff.  If the 1 June deadline is too soon, you can already start
preparing for the next cutoff date on 5 October.&lt;/p&gt;
&lt;p&gt;More information at &lt;a class="reference external" href="https://vscentrum.be/compute"&gt;https://vscentrum.be/compute&lt;/a&gt;&lt;/p&gt;
&lt;p&gt;&lt;a class="fabtn sd-btn sd-btn-outline-info reference external" href="mailto:hpc&amp;#37;&amp;#52;&amp;#48;vub&amp;#46;be"&gt;&lt;span class="fa-solid fa-life-ring"&gt;&lt;/span&gt;Helpdesk&lt;/a&gt; In case of questions, please contact the VUB HPC team.&lt;/p&gt;
&lt;/section&gt;
</content>
    <link href="https://hpc.vub.be/news/2026/tier-1-submission-guide/"/>
    <summary>We are organizing an online information session for VUB users interested in
submitting a Tier-1 project application. It takes place online on 19 May at
14:00. Everyone is welcome to join the session via Microsoft Teams using the
following link:
https://teams.microsoft.com/meet/342738294056735?p=zJOKmdywWZdBwyIZwM</summary>
    <category term="event" label="event"/>
    <category term="motd" label="motd"/>
    <category term="sofia" label="sofia"/>
    <category term="training" label="training"/>
    <published>2026-05-12T00:00:00+00:00</published>
  </entry>
  <entry>
    <id>https://hpc.vub.be/news/2026/maintenance-vsc-account/</id>
    <title>Scheduled maintenance of VSC account page</title>
    <updated>2026-05-05T00:00:00+00:00</updated>
    <author>
      <name>HPC Team</name>
    </author>
    <content type="html">&lt;section id="scheduled-maintenance-of-vsc-account-page"&gt;

&lt;p&gt;On Monday &lt;strong&gt;May 11&lt;/strong&gt;, scheduled maintenance will be carried out on the
VSC account infrastructure starting at &lt;strong&gt;07:00 CEST&lt;/strong&gt;. The expected duration
of the maintenance is approximately 1–2 hours.&lt;/p&gt;
&lt;p&gt;During this period, the &lt;a class="reference external" href="https://account.vscentrum.be"&gt;VSC account page&lt;/a&gt;
may be unavailable. As a result, other services will also be impacted.
This includes the &lt;a class="reference external" href="https://portal.hpc.vub.be"&gt;HPC portal&lt;/a&gt; and the
&lt;a class="reference external" href="https://firewall.vscentrum.be"&gt;VSC firewall interface&lt;/a&gt;, which may be
temporarily inaccessible during the maintenance window.&lt;/p&gt;
&lt;p&gt;Running jobs and SSH connections to the clusters are not affected by this
maintenance.&lt;/p&gt;
&lt;p&gt;We recommend avoiding account-related actions during this time window.&lt;/p&gt;
&lt;p&gt;If you have any further questions, please contact us at &lt;a class="falink reference external" href="mailto:hpc&amp;#37;&amp;#52;&amp;#48;vub&amp;#46;be"&gt;&lt;span class="fa-solid fa-envelope"&gt;&lt;/span&gt;VUB-HPC Support&lt;/a&gt;.&lt;/p&gt;
&lt;/section&gt;
</content>
    <link href="https://hpc.vub.be/news/2026/maintenance-vsc-account/"/>
    <summary>On Monday May 11, scheduled maintenance will be carried out on the
VSC account infrastructure starting at 07:00 CEST. The expected duration
of the maintenance is approximately 1–2 hours.</summary>
    <category term="VSC" label="VSC"/>
    <category term="maintenance" label="maintenance"/>
    <category term="portal" label="portal"/>
    <published>2026-05-05T00:00:00+00:00</published>
  </entry>
</feed>
